What's New
Power And Energy Consultants India Private Limited (PEC) (formerly known as Goldline Power Solutions Limited)
  • Call Now
  • 011 - 42171115

Completed Project

completed
List of key Assignment completed recently or sometime past

Wind Power Sector

Consultant to Ahmedabad Municipal Corporation, Ahmedabad for implementation of their 4.2 MW Wind Power Project at Nakhatranain the State of Gujarat in May, 2019.

Consultant to Satluj Jal Vidyut Nigam Limited (SJVNL) for implementation of their 50MW Wind Power Project at Sadla in the state of Gujarat in April, 2019.

Consultant to Surat Municipal Corporation for their 2.1 MW Wind Power Project at Nakhatrana in Gujarat in March, 2019.

Project Management Consultant to OIL (India) Ltd., Noida for implementation of their 52.5 MW Wind Energy Project.(27.3 MW at Kotiya in Gujarat and 25.2 MW at Unchwas in Madhya Pradesh commissioned in Jan, 2018 and Mar, 2018 respectively).

Consultancy Work for installation and O&M of 4.0 MW ± 10% capacity Wind Power Plant for Ahmedabad Municipal Corporation (AMC) in Gujarat in December, 2017

Consultancy services to Indian Oil Corporation for setting up of 98.3 MW Wind Farm in Gujarat & Rajasthan in March, 2017.

Project Management Consultant to Hindustan Petroleum Corporation Ltd., Mumbai for implementation of their 50.4 MW Wind Farm Project at Tejuva, in Jaisalmer district, Rajasthan in Dec, 2016.

Project Management Consultant to National Aluminum Company Ltd. (NALCO), Bhubaneshwar for implementation of their 100.4 MW Wind Power Project in Rajasthan and Maharashtra in December, 2016 & January, 2017 respectively.

Consultancy Work for installation and O&M of 4.0 MW ± 10% capacity Wind Power Plant for Ahmedabad Municipal Corporation (AMC) in Gujarat in June, 2016.

Project Management Consultant to Bharat Petroleum Corporation Ltd., Mumbai for implementation of their 6 MW (±5%) Wind Power Project at Hanumanthappa, Karnataka in March, 2016.

Project Management Consultant to OIL (India) Ltd., Noida for implementation of their 54 MW Wind Energy Project at Patan in Gujarat & Chandgarh in M.P. in March, 2015.

Project Management Consultant to National Stock Exchange Limited, Mumbai for implementation of their 6.25 MW in the State of Maharashtra in December, 2014.

Consultant to Surat Municipal Corporation for their 6.3 MW Wind Power Project at Ratadi in Gujarat in September, 2014.

Project Management Consultant (PMC) to Satluj Jal Vidyut Nigam Limited (SJVNL) for implementation of their 50 MW wind power project in May, 2014.

Consultant to Surat Municipal Corporation for their 8.4 MW Wind Power Project Bhanwad in Gujarat in July, 2013.

Consultancy services to Indian Oil Corporation for setting up of 48.3 MW Wind Farm atGandikota&Vajrakarur in Anantpur District of Andhra Pradesh in April, 2013.

Project Management Consultant to OIL (India) Ltd., Noida for implementation of their 54MW Wind Energy Project at Dangri, Jaisalmer in Rajasthan in March, 2013.

Project Management Consultant to National Aluminum Company Ltd. (NALCO), Bhubaneshwar for implementation of their 50.4 MW Wind Power Project at Gandikota, Andhra Pradesh in December, 2012

Project Management Consultant to M/s Advance Metering Technology Ltd. For setting up of 5.10 MW Wind Power Project in Ludarwa in Rajasthan, November, 2012.

Project Management Consultant to GAIL (India) Limited, New Delhi for implementation of their 100 MW (4 x 25 MW) in the State of Tamil Nadu and Karnataka. The project was commissioned in March, 2012. GAIL has given Certificate of Appreciation to us for outstanding contribution in completion of 98.75 MW Wind Energy Generation Project.

Project Management Consultant to OIL (India) Ltd., Noida for implementation of their 13.6 MW Wind Energy Project at Ludarwa in the State of Rajasthan in March, 2012.

Project Management Consultant to M/s Advance Metering Technology Ltd. For setting up of 4.50 MW Wind Power Project in Akal in Rajasthan in January, 2012.

Project Management Consultant to Hindustan Petroleum Corporation Ltd., Mumbai for implementation of their 25.50 MW Wind Farm Project Phase-II at Akal, in Jaisalmer district, Rajasthan in Dec, 2010.

Project Management Consultant to Surat Municipal Corporation (SMC), Surat for implementation of their 3 MW in Adodar in Gujarat in November, 2010.

Consultant to GAIL (India) Ltd., New Delhi for providing Project Management Consultancy for setting up 4.5 MW Wind Energy Generation Project in the State of Gujarat in November, 2009.

Project Management Consultant to Hindustan Petroleum Corporation Ltd., Mumbai for implementation of their 25.50 MW Wind Farm Project Phase-I in Dhule, Maharashtra & Pithla, Rajasthan in Jan,2009.

Consultants to M/s Gujarat Fluorochemicals Limited for 23.1 MW Wind Energy Project Gujarat, in March, 2007.

Rendered services to MMTC Ltd; as Project Management Consultant for implementation of their 15 MW Wind Energy Project in Karnataka in March, 2007.

Setting up of 12.5 MW Wind Power Project in the State of Maharashtra commissioned in 31st March, 2005 for REI Agro Ltd, Kolkata in March, 2006.

Installation of 3.75 MW Wind power projects in the State of Maharashtra for Ramsarup Engineering Industries Ltd., Kolkata in March, 2005

Installation and commissioning of 7.50 MW Wind Energy Farm in Jaisalmer district of Rajasthan in the year 2004 for REI Agro Ltd, Kolkata in March, 2004.

Solar Power Sector

Project Management Consultancy (PMC) services for setting up Solar Energy Generation Project of 500 KWp of Oil India Ltd. at Jorhat in the state of Assam in 2018.

Project Management Consultancy (PMC) Services to Vayudoot Solar farms Limited for their 15 MW AC (18 MW DC) Solar PV Power Project in State of Telangna at Bhainsa site in Adilabad District in 2018.

Consultancy Services to Ganpati Alternate Energy Solutions for their various 15 MW Solar PV Power Project in State of Rajasthan in 2017

Project Management Consultant (PMC) Services to Vyshaka Solar Energy Systems Private Limited for their 2 MW Solar PV Power Project in State of Andhra Pradesh at Chitoor with single axis tracker in March, 2017.

Project Management Consultant (PMC) Services to Maheswari Mining & Energy Private Limited for their 10MW Solar Power Project in State of Telangana at Peerampally in March, 2016.

Project Management Consultant (PMC) Services to Global Coal & Mining Private Limited for their 10MW Solar PV Power Project in State of Telangana at Pargi with single Axis tracker in March, 2016.

Project Management Consultant (PMC) Services to Maheswari Mining & Energy Private Limited for their 10MW Solar PV Power Project in State of Telangana at Kothhagaddi with single axis tracker in March, 2016.

Consultancy Services for setting up of 50 kW Solar Rooftop PV Power Project for Pratham Software Private Limited at Jaipur in state of Rajasthan.

Consultancy Services for 10 MW Solar Photo Voltaic for PKR Energy Limited under REC in the state of Rajasthan.

Consultancy Services for 100 kW Solar Photo Voltaic Hybrid System for Statcon Power Controls Limited at Greater Noida (U.P.).

Project Management Consultancy (PMC) Services for setting of 10 MW Solar PV Power Project for Pragrathi Group at Midjil, Mahbubnagar district, Andhra Pradesh.

Consultancy Services for 10 MW Solar Photo Voltaic for PKR Energy Limited under REC in the state of Rajasthan.

Consultancy Services for 100 kW Solar Photo Voltaic Hybrid System for Statcon Power Controls Limited at Greater Noida (U.P.).

Project Management Consultancy (PMC) Services for setting of 10 MW Solar PV Power Project for Pragrathi Group at Midjil, Mahbubnagar district, Andhra Pradesh.

Consultancy services for 10 kW Solar Photovoltaic Power Project for Ind Koeki Needles Private Limited at Delhi in 1996-97.

Consultancy services for 20 kW Solar Photovoltaic Project for La Medical Devices Ltd. in Gujarat in 1996-97.

Consultancy services for 4 MW Solar PV Power Project for Vardhman Textiles Limited (2.0 MW in Madhya Pradesh & 2.0 MW in Rajasthan).

Regulatory

Conducted Regulatory Audit of New Delhi Municipal Council in association with Grewal & Singh, Charted Accounts on behalf of Delhi Electricity Regulatory Commission.

Consultancy Services for Regulatory compliance and filing of Annual Revenue Requirement (ARR) for FY2018-19 along with Annual Performance Review (APR) for FY2016-17 for Rajasthan Rajya Vidyut Prasaran Nigam Limited (RVPNL).

Consultancy Services for Regulatory compliance and filing of Annual Revenue Requirement (ARR) for FY2017-18 along with Annual Performance Review (APR) for FY2015-16 for Rajasthan Rajya Vidyut Prasaran Nigam Limited (RVPNL).

Consultancy Services for Regulatory compliance and filing of Annual Revenue Requirement (ARR) for FY2016-17 along with Annual Performance Review (APR) for FY2014-15 for Rajasthan Rajya Vidyut Prasaran Nigam Limited (RVPNL).

Consultancy Services for Regulatory compliance and filing of Annual Revenue Requirement (ARR) for FY2015-16 along with Annual Performance Review (APR) for FY2013-14 for Rajasthan Rajya Vidyut Prasaran Nigam Limited (RVPNL)

Consultancy Services for Regulatory compliance and filing of Annual Revenue Requirement (ARR) for FY2014-15 along with Annual Performance Review (APR) for FY 2011-12 & 2012-13 for Rajasthan Rajya Vidyut Prasaran Nigam Limited (RVPNL).

Consultancy Services for Regulatory compliance and filing of Annual Revenue Requirement (ARR) and Tariff Petition before J&K State Electricity Regulatory Commission of Jammu & Kashmir State Power Development Corporation Limited, Srinagar as per details here under.

a) Consultancy for determination of ARR and Tariff Petition of 18 HEPs of JKSPDC for the year 2008-09. Abstract of J&KSERC Order No. JKSERC/21 of 2009 dated 31.03.2009 on ARR and determination of generation tariff for FY 2008-09 for JKSPDC.
This was the first Tariff petition prepared by our persons by digging old records since completion of projects as the same were very old.

b) Consultancy for determination of ARR and Tariff Petition of 18 HEPs of JKSPDC for the years 2009-10 & 2010-11. Abstract of J&KSERC Order No JKSERC/04 of 2010 dated 30.04.2010 on ARR and determination of generation tariff for FY 2009-10 and FY 2010-11 for JKSPDC.
During the course, actual parameters of earlier financial years including additional capital cost etc. were included in the petition.

c) Review Petition on J&KSERC order dated 30.04.2010 for Annual Revenue Requirement & Determination of Generation Tariff for FY 2009-10 & 2010-11. J&KSERC passed Tariff Order on 9th November, 2010 and abstract of J&KSERC order dated 9th November, 2010.

D) Consultancy for determination of Capital cost and provisional tariffs for 450 MW Baglihar Stage I Hydro Electric Project and 400 kV double circuit transmission line Baglihar to Kishenpur sub-station of PGCIL for FY 2009-10 & 2010-11. J&KSERC passed Tariff Order on 16th June, 2011 and abstract of J&KSERC order dated 16th June, 2011.

e) Consultancy for determination of ARR and Tariff Petition for all 19 HEPs of JKSPDC for the year 2011-12. J&KSERC passed order on 16th July, 2011 and abstract of J&KSERC Order dated 16th July, 2011.

Lender’s Independent Engineers

Lenders’ Engineering (LE) Services to Power Finance Corporation Limited for 25.2 MW Wind Power Project being set up by Renew Wind Energy (Wetluri) Pvt. Ltd. (RWEWPL) in Beed district of Maharashtra.

Lenders’ Engineering (LE) Services to Power Finance Corporation Limited for 155.4 MW Wind Power Project being set up by Mytrah Vayu (Indravati) Private Limited at Vajrakrur, district Anantpur in Andhra Pradesh &Bhesada, district Jaisalmer in Rajasthan

Lenders’ Engineering (LE) Services to Power Finance Corporation Limited for 100 MW Wind Power Project being set up by Orange Anantpur Wind Power Private Limited at Anantpur district in Andhra Pradesh.

Consultancy Services for Lenders' Engineer for 20 MW Wind Power Project as part of Nipaniya Wind Farm at Shamgarh, Mandsaur District, Madhya Pradesh in association with Darashaw& Co.Pvt. Ltd.

General

Consultancy Services for Consultancy Services for Tariff Determination 24 MW Dikshi HEP for Devi Energies Private Limited.

Bhuvad Renew - Supervision of Construction activities of BOP,WTG Foundations and E&C For Our Upcoming Project In Gujarat, India On Turnkey Basis With Gamesa

Consultancy services to Devi Energies Pvt Ltd. for their 24 MW hydro project and its power evacuation.

Due Diligence

Sub-Consultant to Lahmeyer International (India) Pvt. Ltd. for Due Diligence of 200 MW Wind Power Project of Reliance Clean Power Private Limited.

Sub-Consultant to Lahmeyer International (India) Pvt. Ltd. for Due Diligence of 300 MW Wind Power Project of Beta Windfarms Private Limited

Distribution Improvement Activites

Assignments completed by our sister company Power & Energy Service Co. (A Division of Power And Energy Consultants India Private Limited)

Installation of Single Phase, Three Phase & C.T. Energy meters for BSES Rajdhani Power Ltd. from 2003.

Installation of Single Phase, Three Phase & C.T. Energy meters for North Delhi Power Ltd. now Tata Power Delhi Distribution Limited from 2003 to 2009.

Consumer Indexing, Energy Audit Work – North Delhi Power Ltd (NDPL), Delhi now Tata Power Delhi Distribution Limited
1) Meter Installation Survey (MIS)

  • a. Status of meters viz. physical and operational status, condition of seal, number of digits etc.
  • b. Accessibility of meters- meters were checked for correct installations.
  • c. Correctness of Meter Number, Consumer Number, and address etc.
  • d. Checking of current meter readings of consumers and its correctness validated on the basis of previous readings and average consumption

2) Mapping and Route Sequencing
All meter locations were mapped for route sequencing, K-Number (Consumer Number), bar codes were fixed to each meter and sequence numbers were marked at the premises which do not have clear postal address.

3) Energy Audit
Working of Energy consumed by all consumers on a DTR was worked out by taking reading of each consumer and compared with energy drawn by the DTR for assessing T&C (Technical & Commercial) losses.

4) Linking of connections to DTRs
The work comprised of the following:
• Linking of consumers to DTRs
• Linking DTRs to 11 kV feeders, Power transformer and Grid Substation
• Tracking changes in electrical network
• Collection of consumer & meter data for energy audit and evaluation of losses: -
i) DTR Data
ii) Consumer Details

5) Meter Reading Digitization
a. 11 kV Feeder Meter Reading
b. DTR Meter Reading
c. Consumer Meter Reading

6) Installation of CT meters on DTRs and meters including accuracy check.
Detection of tampered meters – direct supply, terminal seal / main seal broken etc.